AndyO
Mar 26, 2020Nimbostratus
Priority Group Activation Secondary Node
I want to keep all new and existing traffic on a secondary node after a failure and resumption of the primary. This is a very flaky application, however, so we would like to fail back to the primary if the secondary fails without manual intervention- meaning manual resume is off the table. Any ideas? Thanks!