Forum Discussion
Paulius
Apr 22, 2024MVP
With active/active setup you have 2 traffic groups 1 for one unit and another traffic group for the other unit. With those two then you divide the Virtual Servers (VS) between them, so if you have 6 virtual servers you would have 1-3 going to group 1 and 4-6 going to group 2. Then you configure failover so that the traffic group for either unit moves to the other unit that hasn't failed. I do not believe you could do something such as having VS 1 exist on both unit 1 and unit 2 at the same time.