Forum Discussion

kevin5866_19733's avatar
kevin5866_19733
Icon for Altostratus rankAltostratus
Feb 20, 2019
Solved

Upgrade from 2150-2250 blades

I am planning an upgrade from 2150 blades to 2250 blades. Single blade in each chassis. Not finding any docs regarding this patch. I have upgraded from 2100-2150 in the past and do see those docs o...
  • RaghavendraSY_7's avatar
    Feb 21, 2019

    Migrating 2150 blade (Existing chassis) to new 2250 blade (new F5 chassis):

     

    1. Take UCS backup of present devices.
    2. Configure management IP on new blades with different IP.
    3. Restore the UCS files on new blades with no-license and no-platform-check commands
    4. Make sure new blades are connected to different switch ports.
    5. Now change the interfaces 1.1-1.4 and 2.1-2.4 (1.5 to 1.8 move here) on new blades and assign respective VLANs/Self IP's.
    6. Make sure all configurations are in place before the maintenace activity.
    7. During the maintenance activity day disable interfaces on existing 2150 F5 and enable it on new 2250 blade.
    8. Clear the arp entries on connected switches for the subnets which are configured on F5.

    Hope this helps and let me know if any more information is required.